Bulb Planting-DEC-2021
Bulb Planting
Bulbs have been planted in various areas:-
1. Bottom of Windmill Hill – 200 crocuses and the area litter picked.
2. The traffic island on the Cannock Road at the entrance to Hilton Cross Industrial Estate – 400 Daffodil bulbs were planted with the help from Benniman Construction Group.
3. The bottom of Old Hampton Lane – 60 Allium bulbs planted and the area weeded and tidied up.
4. The Staffordshire boundary sign on Blackhalve Lane, area strimmed back, undergrowth cut back and planted with Daffodil bulbs.
5. Broad Lane boundary with Bloxwich planted with approx. 250 Daffodil bulbs – thanks to Neil and Jon.
6. Broad Lane from Springhill sign and around traffic controlling chicane – areas litter picked, strimmed, hedge around sign cut back and planted with 400 Daffodil bulbs with the help from local residents, many thanks to them.
7. Jubilee planter tidied and litter picked.
Thanks to everyone involved, stay safe and have a good Christmas.